ANALISIS PENINGKATAN KAPASITAS PRODUKSI DENGAN MEMBANDINGKAN ANTARA PENAMBAHAN SHIFT DAN KERJA LEMBUR PADA UD. BAROKAH


ABSTRACT
The man shoes manufactur process at UD. Barokah still uses manual operation and semiautomatic
machine that it help production process done at schedule correctly. The long time operation strategy at UD.
Barokah at special level defined with capacity where capacity growth plan could planned with many
alternative ways in example over time shift, additional work shift by labour contract and contract sub.
The capacity additional can do by the economics and finance analysis toward cost that caused
capacity additional and factors that influencing included its.
UD Barokah is the small factory that produce many leather product in exemple wallet, jacket, shoes,
belt, bag and hat but the main product is man leather shoes. By operating capacity additional in the decesion
that made by choose the best alternative that can see from the biggest Net Present Value (profit). The
additional capacity in 2010 until 2012 has been analysed and the additional work shift can produce the
highest profit 152.037.934 (in year 2010), Rp 131.052.828 (in year 2011) dan Rp 112.083.410 (in year 2012)
Keyword : Production Plan, Capacity, Forecast, Demand, Finance

ANALISIS PENINGKATAN KAPASITAS PRODUKSI DENGAN MEMBANDINGKAN ANTARA PENAMBAHAN SHIFT DAN KERJA…