ANALISIS RISIKO FONDASI BORED PILE DAN TIANG PANCANG PROYEK TUNJUNGAN PLAZA 6 SURABAYA


ANALISIS RISIKO FONDASI BORED PILE DAN TIANG PANCANG
PROYEK TUNJUNGAN PLAZA 6 SURABAYA
Felicia T. Nuciferani [1] , Mohamad F.N Aulady [2] , Nila A. Putri [3]
Jurusan Teknik Sipil-InstitutTeknologi Adhi Tama Surabaya [1] [2][3]
Email : [email protected]
ABSTRACT
Implementation of risk management at many building projects has already done, but most risks are still managed
in general. This study aims to look a little deeper on the risks associated of the building, especially the down
structure. Collecting data conducted on the construction of Tunjungan Plaza 6 which has bored pile foundation
and piling. Risk Identification risk from the perspective of the contractor to determine the level of probability and
risk impact on performance fees. The results of the questionnaire were analysed by first phase of a risk matrix
method to determine the risk rating. Results of the questionnaire the second stage to determine the policy
response to the risk, the risk factors rated high risk in the work foundations bored pile and the pile is the collapse
of the retaining wall, one analysis of the causes was the stability of the ground less well with the type of response
A2, which means the project was accepted and risk controlled with careful planning.
Keywords: Foundation, Risk Identification, Risk response

Full Text

Peer Review